«

»

Mirabeau Point Improvements

On Saturday, October 29, members of the SCKC, along with other volunteers, gathered to dig post holes and erect a fence to guide people down the proper path to the water, part of the effort to repair damage previously done to the hillside at this popular and heavily used access location. Hydro-seeding the hillside to prevent erosion and reduce weed infestation will occur in the spring. A big thank-you goes to Spokane River Forum, Northwest Whitewater, REI and SCKC members who worked together to achieve this much needed improvement!

 

Digging post holes in valley rock is a challenge!

SCKC member Susan Luchesi sets a fence post.

Setting the fence rails

Permanent link to this article: http://www.sckc.ws/topic/access/mirabeau-point-improvements-november-2011/

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>